 |
ANALYSIS
- Analysis of the present situation with a profile of strength and weakness.
- Emphasizing on suggestions for short coming elimination.
Main points:
Organizational structure
Layout situation
Workflow
Transport system
Workstation development
Employee selection- and training programme
Methods- and efficiency training
Time study / -management system
Wage system
Quality management
CONCEPTION
- Development of conception targets including a cost-analysis.
- In cooperation between client and consultant precisely defined target
- Step by step procedure
ORGANIZATION
- Establishment of the organizational structure for reorganisation
- Targets:
Verification of the organization chart
Improvement of the organization and the manufacturing sequence
Central tasks of the executives
Appropriate coaching of the executives
- Selection of required production equipment, means of transportation and auxiliaries
- Making optimal use of already existing resources
IMPLEMENTATION
- We are "Change Management Consultans"
- The implementation of the conception targets is very important for us to realize the conception together with our client and at his site.
- "On the job" staff training
- Documentation of the expiries
- Targets:
Improvement of the product quality
Efficiency improvement
Wage increase for the employees
Reduction of the production costs.
Improvement of the employees’qualification
Flexible employment of all staff members
FOLLOW-UP OF THE PROJECT
- Check of all implemented and realized steps. Correction of possible
undesired trends and consequences.
Home
|
|